Difference: CreamWorkPlan (27 vs. 28)

Revision 282009-05-26 - PaoloAndreetto

Line: 1 to 1
 
META TOPICPARENT name="TestWokPlan"

CREAM Test work plan

Line: 29 to 29
 The following list of commands is required in order to retrieve and build the latest stable release:
etics-workspace-setup
etics-get-project org.glite
Changed:
<
<
etics-checkout --config glite-testsuites-cream_R_1_0_5_0 --project-config glite_branch_3_1_0 org.glite.testsuites.cream
>
>
etics-checkout --config glite-testsuites-cream_R_1_0_6_0 --project-config glite_branch_3_1_0 org.glite.testsuites.cream
 etics-build org.glite.testsuites.cream
Line: 41 to 41
 
    • Changed command line of the CE monitor client, this version can be used only with the clients whose version is 1.11 or higher
  • 1.0.5.0 (2009-04-17)
    • Fixed minor issues
Changed:
<
<
    • New option "nopurge" is available
>
>
    • New options "nopurge" and "sotimeout" are available
  • 1.0.6.0 (2009-05-26)
    • Fixed man pages in rpm
    • Fixed minor issues
 

Work plan

 
This site is powered by the TWiki collaboration platformCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback