  1. MaxRetryCount
The test should submit a lot of long jobs with short ReplanGracePeriod using a small number of resources, at the end of the test some jobs should be replanned (i.e. reassigned to different CEs). This can be evinced from the logging info of the jobs. (TBD)
Added:
>
>
A list-match with a jdl where EnableWMSFeedback is set to true must return only CREAM CE
 

Limiter mechanism

The WMS has implemented a limiter mechanism to protect himself from overload. This mechanism is based on different parameters anc can be configured inside wms configuration file. All these parameters should be checked and tested. (TBD)
 
 